VSC - Advanced integrated manufacturing supply chain solutions

VICTOR Supply Chain
EN

Sourcing programs

China+1: add Vietnam to your supply base without the trial and error

Tariffs, single-country risk and customer requirements push many buyers to add a second origin. We map Vietnamese capacity for your products, qualify factories, run pilot orders alongside your current supplier and scale what works.

Best for
Buyers with most volume in one country who need a second origin
Typical timeline
Feasibility in 3–4 weeks, pilot order in 3–5 months
You receive
Feasibility report, qualified factories, landed-cost comparison

The challenge

Why diversification stalls

  • 01

    Unknown capacity

    It is hard to tell from abroad which Vietnamese factories really make your product, and at what scale and quality.

  • 02

    Origin rules

    Moving assembly alone may not change the country of origin. Duty savings depend on where materials come from and how goods are processed.

  • 03

    Risk to current supply

    Switching too fast puts your existing supply at risk; switching too slowly means paying the tariffs for another year.

What is included

Scope of work

  • Feasibility study

    Which parts of your range Vietnam can make well, at what cost, and where the gaps are.

  • Landed-cost comparison

    Factory price, freight, duties under the applicable trade agreements and lead time, compared with your current origin.

  • Origin assessment

    A practical check of material sourcing and processing against the rules of origin for your import market.

  • Factory qualification

    Search, audits and capability tests for the shortlisted factories.

  • Pilot orders

    Small first orders run in parallel to your current supply, with full inspection and a lessons-learned review.

  • Ramp-up plan

    Volumes moved step by step, with second sources and quality gates agreed in advance.

How it works

Step by step

  1. Product review

    We review your range, drawings, volumes and current costs.

    You receiveList of products suited to Vietnam

  2. Market scan

    We map capacity and request indicative quotes from capable factories.

    You receiveFeasibility and landed-cost report

  3. Qualification

    We audit the best candidates and run sample rounds.

    You receiveAudit reports and approved samples

  4. Pilot

    A first order is produced, inspected and shipped alongside your current supply.

    You receivePilot inspection and delivery review

  5. Scale

    Volumes are moved in agreed steps, with quality and delivery tracked per supplier.

    You receiveRamp-up plan and supplier scorecards

Deliverables

  1. Feasibility report by product line
  2. Landed-cost comparison against your current origin
  3. Rules-of-origin assessment for your import market
  4. Audit reports for shortlisted factories
  5. Pilot order inspection report
  6. Ramp-up plan with volumes and quality gates

A good fit if you

  • Pay tariffs or face risk from relying on one country
  • Have customers asking for a second origin
  • Want facts on cost and capacity before committing
  • Prefer a phased move that protects current supply

Questions

Frequently asked

Will moving to Vietnam always cut duties?

Not automatically. The saving depends on your import market, the trade agreement and whether the goods meet its rules of origin. We assess this before you commit, and say so if the numbers do not work.

Can Vietnamese factories match our current quality?

For many categories, yes; for some, capacity is still limited. The feasibility study tells you which, before you spend on tooling or samples.

Do we need to stop buying from our current supplier?

No. Most clients keep their current supplier during the pilot and move volume only after the new source has proven itself.

Start a project

Start with China+1: move or add production in Vietnam

Tell us about the product and what you need. We reply within one working day with questions or a written proposal.